submittal review โข J. Dickson, PE โข 2026-06-09
Revise and Resubmit
Revise and Resubmit
Corrections required โ resubmit
Submittal 23 07 00-001 for HVAC ductwork insulation proposes ThermaSeal TS-200 (R-6.0). Spec section 23 07 00 para 2.3 requires R-8.0 minimum on concealed supply ductwork. The submittal does not meet the specified R-value and omits the fire-stopping detail at rated-wall penetrations.
โR-value meets spec minimum โ FAILS (R-6.0 vs R-8.0)
โFire-stopping detail at penetrations โ missing
โManufacturer product data included โ compliant
โInstaller qualifications listed โ compliant
Potential Conflicts
CRITICAL
Proposed R-6.0 is below the specified R-8.0 minimum โ non-compliant
REVIEW
No fire-stopping detail provided for duct penetrations at rated walls
REVIEW
Product data does not confirm FSK facing on all runs
Key Requirements
R-8.0 minimum on concealed supply ductwork (23 07 00 ยง2.3)
Flame spread โค25 / smoke developed โค50 per ASTM E84
Fire-stopping detail at rated-wall duct penetrations
FSK facing on all concealed runs
Action Items
Urgency
Action Item
Owner
High
Resubmit with R-8.0 product meeting ยง2.3
ACME Mechanical
High
Provide UL fire-stopping detail for rated-wall penetrations
ACME Mechanical
Medium
Confirm FSK facing on concealed runs
ACME Mechanical
Cross-Reference Diagram
Reviewer Notes
Disposition: Revise and Resubmit. The R-value deficiency is the controlling issue; resubmit with a compliant R-8.0 product and include the fire-stopping detail before fabrication.